Speed: 3–5× faster
A typical figure for the structure and walls of a factory shed against conventional on-site construction (RCC frame, brick walls, plaster and paint). It does not include approvals, services or fit-out. Your programme comes with the quote.
Labour: 50% less on site
A typical figure for the number of people needed on site for the structure and walls, against conventional on-site construction. Work done in our plant is not counted as site labour.
Heat: 50–65% smaller swing
A typical published value for how much a 150 mm concrete wall reduces the daily temperature swing on its inner face, compared with a single steel sheet. It is not a measured room temperature. Indoor temperature also depends on the roof, ventilation and what runs inside.
Fire
Concrete is non-combustible. Structural steel needs fire protection to reach a required fire rating; precast concrete reaches it through its concrete cover. Fire ratings for your building are set during structural design.
Sizes, spans and capacities
All sizes, spans, load classes and capacities on this site are indicative. Final values are set after structural design for your project.
Comparisons
Comparisons are between construction methods in general, not between companies. Your design and site decide the final figures.
Renders
Images marked illustrative are renders, not photographs of Prahant Precast projects. Photos marked Prahant group show the group’s conventional construction work.
Group figures
Figures marked Prahant group (2008, 15+ projects, 5 lakh+ sq ft) are the Prahant group’s record in conventional construction.